- Deadline for implementation from 12.12.2022 G. to 04.2023 G.
- -Making suspended ceilings - "Amstrong type",with reinforced construction of metal profiles in premises: 2.1;2.6;2.2;2.7;2.9;3.1;3.4;4.1 ,
- -Making suspended ceilings with GK with a reinforced construction of metal profiles in room 3.6 ,
- -Collapse, making partial gypsum plastering on walls and ceiling c room 2.2;2.7;2.9;3.4;3.6;4.1
- -Painting with light paint plinth, in corridors after completed gypsum putty ,
- -Painting with latex, in classrooms and corridors after completed gypsum putty in d. 2.2;2.7;2.9;3.4;3.6;4.1,
- -Implementation of flooring from laminate and balum in premises: 2.2;2.9;3.4;3.6(talcum powder);4.1.
"STACKING, PAINTING, AND REPLACEMENT OF FLOORS IN THE PREMISES TO THE BUILDINGS ABOVE WORKSHOPS, LOCATED IN BLOCK 1/ONE/, 2 /TWO/, 3 /THREE / I 4 /FOUR/ FOR THE NEEDS OF THE VOCATIONAL HIGH SCHOOL FOR MECHANICAL ENGINEERING "PROFESSOR Tsvetan Lazarov" - PLOVDIV
Area of the property [m2]
1200