The construction of the site was carried out in the period from 16.12.2020 G. to 31.10.2021 G.
Educational building / warm connection / is a gym
- Partial strengthening of a building structure
- Replacement of joinery- partially
- Repair of facades – partially
- Complete replacement of heating installation. Replacement of heat source , replacement of an existing boiler;
- External site heating pipeline – between the training building and the workshop building.
- Interior renovation – cabinets – complete replacement of flooring and cabinet doors
- Complete replacement of the electrical installation
- Lightning protection
- Drainage of sidewalks around the school building and gym
- Thermal insulation of the roof space
- Building an accessible architectural environment
Corps training workshops
- Thermal insulation of the facade – overall
- Replacement of joinery – overall
- Complete replacement of the electrical installation;
- Complete replacement of the heating system;
- Internal thermal insulation of the under roof space
- Interior renovation
- Building an accessible architectural environment