"Engineering - design, "Engineering - design 101 "Engineering - design, approved for funding under the Operational Program "Growing Regions" 2014-2020, “approved for funding under the Operational Program "Growing Regions"”approved for funding under the Operational Program "Growing Regions"
The construction of the site was carried out in the period from 16.12.2020 G. to 31.10.2021 G. Учебен корпус/топла връзка/ е физкултурен салон Частично укрепване на строителна конструкция Подмяна на дограма- частично Ремонт на фасади – частично Пълна подмяна на отоплителна инстралация. Replacement of heat source , replacement of an existing boiler; External site heating pipeline – между учебен корпус и корпус
"Repair of bathrooms and construction of new bathrooms in the workshop building, including repair of a reinforced concrete staircase and installation of outdoor park lighting of the GHG “Tsar Ivan Asen II ”. Asenovgrad
The construction of the site was carried out in the period from 30.10.2020 G. to 15.12.2020 G. Подмяна на дограма и вътрешни интериорни врати Сухо строителство пред стенни обшивки от ГК щендерни стени от ГК окачени тавани Облицовка на стени и направа на настилки от керамични плочи Ремонт на ел. инсталация Ремонт на ОВК Ремонт на ВиК инсталация и